The patchwork of drop clothes has been laid down. The door removed for easier access and navigation within the room. Trim edges have all been taped. I'm ready to prime the walls this afternoon.
Showing posts with label preparation. Show all posts
Showing posts with label preparation. Show all posts
Tuesday, December 09, 2008
Painting the study, continued
Work on painting the study continues today. The room is now completely empty (well almost, the cable connection is in the corner bucket).

The patchwork of drop clothes has been laid down. The door removed for easier access and navigation within the room. Trim edges have all been taped. I'm ready to prime the walls this afternoon.



The patchwork of drop clothes has been laid down. The door removed for easier access and navigation within the room. Trim edges have all been taped. I'm ready to prime the walls this afternoon.
Wednesday, February 28, 2007
The tax man prepareth
Yea, and the time of year came for the tax man to prepareth to file
and he was busy about the filing and calculations
and FAFSA forms, and the like, and hence his blogging was limited
and he was busy about the filing and calculations
and FAFSA forms, and the like, and hence his blogging was limited
Subscribe to:
Posts (Atom)