Saturday, September 01, 2007
Franklin: Train station painting complete
As promised by the MBTA, the fixing up of Franklin Station (at least the downtown one as shown here) has progressed.
The blacktop was freshly coated. (The weeds were mostly taken away)
The yellow line was given a single pass with a paint roller.
The new lettering was stenciled in.
It looks fresh and clean for now.
Another picture of the work in progress can be found here.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment